TIMELINES Spa*ark Energy_15 This Gantt chart presents estimated times and costings to construct a power plant using assumptions which will almost certainly be modified following the findings of the initial ~2km test hole. Eighteen months have been estimated to drill and log this hole, and included in this time-frame is a scoping study designed to tighten both costs and potential incomes. Following completion of the test hole, informed planning for the initial plant capacity can take place. The 26MW plant used below is an arbitrary size, originally chosen for the high-level financial modelling, since a sub-30MW plant may have less stringent requirements to join the NEM. A total of four years has been allowed to complete the drilling, install the turbines, generators, etc, and connect to the grid. Activity Project Management Lemont Geothermal Project Draft Budget (AUD millions) 1H_yr_1 2H_yr_1 1H_yr_2 2H_yr_2 1H_yr_3 2H_yr_3 1H_yr_4 2H_yr_4 0.50 $1.0 $1.0 $1.0 $1.0 $1.0 $1.0 $1.0 $7.5 26MW Total Scoping Study 0.15 $0.2 Title, permits, legals, stakeholders 0.15 $0.2 $0.4 Detailed geophysics & site works 0.50 $0.5 $1.0 Slimline test hole ~2km $2.0 $2.0 Well testing (temp, flowrate, structure) $0.5 $0.5 Definitive Feasibility Study $2.0 $3.0 $5.0 Direct to Initial Plant Build of (e.g) 26MW $40.0 $45.0 $30.0 $30.0 $30.0 $175.0 Contingency $28.5 $28.5 Continued plant development Spas, glasshouses, fish farming, mineral extraction, vegetable drying, etc Half-yearly Spend $1.3 Cumulative Capex $1.3 $1.7 $3.0 $5.5 $44.0 $46.0 $31.0 $31.0 $59.5 $8.5 $52.5 $98.5 $129.5 $160.5 $220.0 $220.0 As previously mentioned, the scoping study may include costings for a demonstration plant. A rough estimate indicates a ~0.5MW (gross) plant might cost $20M for a low temperature plant using two slimline holes, one being the initial test hole, and would take perhaps 3 years to complete. Some direct use applications would be able to commence as soon as two holes; i.e., one production hole and one reinjection hole, had been completed and cased.
View entire presentation