Investor Presentaiton slide image

Investor Presentaiton

EMERALD HYDROGEN HYDROGEN – CABOOLTURE PROJECT HE.S BASIN A- CATCHMENT A AREA-1.64Ha BASIN SIZE 50x1503m ADMINISTRATION AND AMENITIES COVERED PROCESSING PLANT COVERED PROCESSING PLANT FUEL BUND MAINTENANCE AND STRORAGE PROPOSED WEIGHBRIDGE. 38m INFRASTRUCTURE BUFFER OVERLAND FLOW DIVERSION BUND HES BASIN B- CATCHMENT BAREA-241Ha BASIN SIZE 50x17x2.5m OUTLET AND LEVELS SPREADER H.E.S BASIN C- CATCHMENT C AREA-2.25Ha BASIN SIZE 60x14x2.5m EXISTING PROPERTY BOUNDARY INCINERATOR PYROCAL BIO-MASS INCINERATOR OVERLAND FLOW DRAIN EXISTING OVERLAND FLOWPATH Track 10.00 SETBACK HES BASIN D CATCHMENT GAREA= 2.97Ha BASIN SIZE=66x18x2.5m PROCESSING AND STOCKPILE AREA INFRASTRUCTURE BUFFER Track 20m VEGETATION BUFFER re Hydrogen
View entire presentation