Project Snapshot Infrastructure Causeway Pedestrian and Cyclist Bridges CIVMEC INVESTOR PRESENTATION OCTOBER 2022 CLIENT Main Roads WA (MRWA) LOCATION Perth, WA DURATION April 2022 Late 2024 OVERVIEW The project comprises two cable-stayed bridges, approach embankments and connects Victoria Park foreshore with Heirisson Island and the Perth CBD. The completed bridges will be approximately 1,000 metres long and 6 metres wide. The scope includes the completion of the architectural and engineering design; fabrication and transportation to site of approximately 1,500 tonnes of complex steel structures; ground preparation, earthworks and piling for approach embankments; in-river works, including piling, pile caps and pylon structures; and structural erection and electrical installation. The contract will be delivered in an integrated alliance with Civmec, Seymour Whyte Constructions, WSP and MRWA. 9