NHPC Renewable Energy and Pump Storage Project Updates
NHPC: Projects Under Construction
Project Under Construction-Standalone
E NHPC Project
Subansiri
Lower,
E (8X250) Assam/ Ar.
Pradesh
Installed Design
Capacity Energy
(MW)
(MU)
Type of the
project
CCEA Estimated
Cost (Rs. Crore)
(Price Level)
Anticipated
Project Cost (Rs.
Crore)
Provisional
Project
Expenditure
till -June'23
(Rs. Crore)
2000
7422
Run of River
with small
6285.33
(Dec'02)
pondage
21247.54
(completion
level))
18729.43
एनएचपीसी
NHPC
33
Expected
Commissioning
Schedule
FY 25-26 (Q-1)
(Full
commissioning)
[Commissioning of
2 units is expected
in Q4 FY'24 and
remaining 6 units
are expected to be
commissioned one
by one by May'25]
E Parbati II, (4X200)
Himachal Pradesh
800
3124
Run of River
with small
3919.59
(Dec'01)
11134.54
(July'22)
10737.09
FY 23-24 (Q-4)
pondage
E Dibang, (12X240)
2880
11223
Hydropower
31876.39
Arunachal Pradesh
cum flood
(May'21)
31876.39
(May'21)
2171.88
FY 31-32 (Q-4)
moderation
Total (A)
IN
5680
21769
scheme
42081.31
64258.47
31638.40View entire presentation