NHPC Renewable Energy and Pump Storage Project Updates slide image

NHPC Renewable Energy and Pump Storage Project Updates

NHPC: Projects Under Construction Project Under Construction-Standalone E NHPC Project Subansiri Lower, E (8X250) Assam/ Ar. Pradesh Installed Design Capacity Energy (MW) (MU) Type of the project CCEA Estimated Cost (Rs. Crore) (Price Level) Anticipated Project Cost (Rs. Crore) Provisional Project Expenditure till -June'23 (Rs. Crore) 2000 7422 Run of River with small 6285.33 (Dec'02) pondage 21247.54 (completion level)) 18729.43 एनएचपीसी NHPC 33 Expected Commissioning Schedule FY 25-26 (Q-1) (Full commissioning) [Commissioning of 2 units is expected in Q4 FY'24 and remaining 6 units are expected to be commissioned one by one by May'25] E Parbati II, (4X200) Himachal Pradesh 800 3124 Run of River with small 3919.59 (Dec'01) 11134.54 (July'22) 10737.09 FY 23-24 (Q-4) pondage E Dibang, (12X240) 2880 11223 Hydropower 31876.39 Arunachal Pradesh cum flood (May'21) 31876.39 (May'21) 2171.88 FY 31-32 (Q-4) moderation Total (A) IN 5680 21769 scheme 42081.31 64258.47 31638.40
View entire presentation