Development Timeline Multipurpose 1 Terminal 2 (2015-2017) • Industrial Area 3000 Ha (2016-2018) • Multipurpose Terminal Project Spec CAPEX: 3.7 Trillion Rupiah Dimension 60 x 500 Mtr JETTY Length of Trestle 2,85 KM Lenght of Berth 1.000 Mtr (2x 500 Mtr) Bearing Capacity 3 Ton/M2 Water Depth -17 M. LWS BERTHS CAPACITY Liquid Bulk Carrier: max. DWT 50.000 Container Vessel: max. DWT 60.000 • YARD AREA Total Area ± 18 Ha Tank yard ± 4 ha Container yard ± 14 ha Bearing Capacity 6 - 8T/M2 MODALITIES: Excellent Rail, Road connection & Energy 4 3 Industrial Gateway Port Project Spec Dedicated Terminal . JETTY (Hub Port) (2017-2019) Integrated Urban Area (2021-2023) Dimensi: 60 x 300 Mtr Trestle : 825 Mtr Causeway: 1500 Mtr Jetties 600 Mtr (2x 300 Mtr) Capacity: 3 Ton/M2 Draft: -15 M. LWS JETTY CAPACITY Coal Carrier: max. DWT 60.000 Clinker Vessel: max. DWT 60.000 • • • AREA CAPACITY (100 Ha by 2017) Power plant :20 Ha Coal Storage: 20 Ha Cement factory: 7 Ha + 15 Ha Public area: 5 Ha Supporting Power: 6 - 8 T/M2 INFRASTRUCTURE: Railway, Trans Sumatera Highway 35
View entire presentation