Investor Presentaiton
POČERADY POWER PLANT
DESCRIPTION AND TECHNICAL PARAMETERS
Executive Summary
Compliance with IED emission limits (06/2020)
The units will meet the IED limits after certain
operational and technical measures are taken
Π
Compliance with BREF/BAT emission limits (08/2021)
Počerady
power plant
175 mg/Nm3
130 mg/Nm3
8 mg/Nm3
7 μg/Nm3
The power plant was commissioned between
1970-77 and passed the first wave of greening
(desulphurisation) in the years 1994-96.
■ Over 80% of the produced VEP (especially the
fly ash) is transported to the mine of Vršanská
uhelná.
■ In the site of coal power plant, the gas power
plant is also situated, the ownership of which
is separated and the common equipment (e.g.
water feeder) is owned by ČEZ.
■ The power plant has already exhausted the
usual life of units (~ 240 thousand hours), the
average number of hours per unit as of 2018 is
about 290 thousand (see right).
-
SOx
NOx
PM
Hg
Average values of continuous emission measurements for 2018 (boilers B2-B5)
BREF/BAT limits valid from 08/2021 (average annual values)
Further operational and technical measures are
planned to comply with the BREF/BAT limits
Technical parameters and unit operating hours
Capacity 1000 MW (5 x 200 MWe)
•
Unit B2
•
Unit B3
Unit B4
Unit B5
Unit B6
e
306 th. hours
307 th. hours
300 th. hours
271 th. hours
271 th. hours
15
Note: Top - Take or Pay; VEP - Secondary Energy Products
Operating hours of the unit as of the end of 2018
- Typical life by number of operating hours (approx. 240 ths. hours)
CEZ GROUPView entire presentation