Leading IPP with ~4.5 GW of Installed Generation Capacity
Baspa II: 300MW & Karcham Wangtoo: 1,091MW
Barmer: 1,080MW
Configuration: 8 X 135MW
Units operating: since 2010³
Technology: Sub-critical pithead Lignite based TPP
•
Fuel Source: Captive Lignite mines of BLMCL¹
•
•
Power Offtake: Long Term PPA
Project Cost: INR 7,165 Crore/ $1,005mn²
Ratnagiri: 1,200MW
Configuration: 4 X 300MW
Units operating: since 2011³
Technology: Sub-critical TPP
Fuel Source: Imported Thermal Coal
Power Offtake: Long Term PPA & Merchant
Project Cost: INR 5,516 Crore/ $774mn²
Vijayanagar: 860 MW
Configuration: 2 X 130MW and 2 X 300MW
Units operating: since 2000³
Technology: Sub-critical TPP
Fuel Source: Imported Thermal Coal & Gas
Power Offtake: Long Term PPA & Merchant
Project Cost: INR 3,096 Crore/ $434mn²
JSW Energy
•
Units operating: Baspa II since 2003 and Karcham Wangtoo
since 2012
•
Technology & Fuel Source: Hydro
Power Offtake: Long Term PPA
Asset Value to JSW Energy: INR 9,275 Crore/ $1,301mn²
Kutehr: 240 MW (Under-construction)
240 MW hydro plant under construction at Kutehr
(Himachal Pradesh) awaiting regulatory approval for PPA
with Haryana Discom
Salboni: 18 MW (Under-construction)
18 MW thermal plant under-construction at Salboni (W.B.)
Nandyal: 18 MW
Commissioned 18 MW thermal capacity in Q1FY20 at
Nandyal (A.P.) with LT PPA under Group captive scheme
Solar: 10 MW
Commissioned ~10 MW solar power projects across various
locations within JSW Group, and
opportunities in Renewable segment
Well Diversified Fuel/Geography/Offtaker Mix
(1) Long term FSA with BLMCL for supply of lignite from its captive mines (2) USD/INR = 71.3 Source: RBI reference rate as of Feb 10, 2020
(3) Denotes start of first unit in respective fiscal year; TPP-Thermal Power Plant