Investor Presentaiton
Aberfoyle and Great Pyramid
TNT MINES
Aberfoyle Prospect - Cross Section
Proposed
Open Pit Outline
◉
☐
◉
Aberfoyle Tin & Tungsten Project represents a
near term development opportunity.
Potential for combined open-cut and
underground mine feeding low CAPEX gravity
separation plant.
Royal George JORC 2012 Inferred Mineral
Resource of 800,000 tonnes at 0.33% tin for
2,640 tonnes of contained tin.
Royal George Mine represents a planned
development satellite mine to supplement the
Aberfoyle deposit.
B-
North West
-50m
Proposed
in Pit Outline
Open
No. 5 Level
100m
150m
-
B
with Quartz Veining
ABRC002
ABRC001
NIUMINCO
-B
South East
SECTION
TNT MINES
SURFACE
No 1 Level
No.2 Level
No.4 Level
Minemaker Drill Holes
Underground Development Drives
Underground Development Drives
Downhole Sn ppm
(Results Clipped to 5000ppm)
>3% Quartz Vein Content
>2% Quartz Vein Content
Permian Sediments
Mathinna Group
☐
Great Pyramid Tin Project has a JORC 2012 inferred Mineral
Resource of 5.2m tonnes @ 0.2% Sn for 10,400 tonnes
contained tin.
☐
Shallow, near surface deposit with low stripping ratio.
☐
Excellent infrastructure and access to site.
☐
Undergrunt Develpmat
Horal Pit Ou
Royal George Mine
EL27/2014
BROCKS
TNT MINES
Great Pyramid Project
RL2/2009
Brocks
North
Block
South
NOR-
PASSPOR
GP
Block
Low CAPEX potential as planned operation can be utilised as a
satellite mine to Aberfoyle.
Historical Drilling
Historical Shaft
Historical Adit
Zone of Mineralisation
Fault
Dionte Dyke
Shale
Mainly Sandstone with
Interbedded Shale
(locally Silicfied)
599,400 E
SOUTH
BLOCK
NORTH
BLOCK
5996
599000mE
POUSS
100m
00504 MGA 25
FO
19View entire presentation