Investor Presentaiton slide image

Investor Presentaiton

Hughes Project Drilling Hole ID Length Ag Au AgEq (m) (g/t) (g/t) (g/t) SUM21-30 2.8 2,252 21.6 3,971 Belmont incl. 0.9 5,969 60.2 10,790 VIEWED AREA SUM21-31 4.3 913 7.86 1,529 incl. 0.6 4,338 56.5 8,989 SUM20-20 1.4 1495 16.9 2,867 Belmont Mine incl. 0.7 2,910 33.1 5,598 SUM20-06 18.5 286 3.1 536 incl. 2.5 1,762 19.99 3,385 SUM20-19 0.8 1480 15.15 2,696 OPEN OPEN SUM20-21 2.0 103 4.58 505 incl. 0.4 460 24.7 2,637 SUM20-01 2.3 805 3.77 1,064 incl. 0.8 1,870 5.53 2,181 Murray SUM21-42 5.7 337 2.1 492 Mizpah Ext. Targets Ruby Discovery incl. 0.9 1,301 7.86 1,878 3.5 km Ruby SUM20-10 2.0 258 2.63 469 incl. 0.5 790 8.07 1,437 SUM20-17 0.9 560 5.19 971 *AgEq is calculated using US$20/oz Ag, US$1,800/oz Au, with metallurgical recoveries of Ag - 90% and Au - 95%. AgEq = (Ag grade x Ag recovery)+((Au grade x Au recovery) x (Au price / Ag price)). Murray SUM21-40 6.1 253 2.53 455 True thicknesses are estimated to be 70-80% of drilled intercept length incl. 60 0.9 543 5.42 977 Summa Silver Corp. | TSXV:SSVR | OTCQX:SSVRF Frankfurt: 48X Page 19
View entire presentation