Investor Presentaiton
Implement ESG Management (1)
Zero Carbon Challenge 2050
-50.0%
Roadmap for achieving net zero CO2 emissions in the railway business
Energy type
(Breakdown of CO2
FY2021.3
~FY2031.3
Tohoku area CO2 free by FY2031.3
JR
JR-EAST
~FY2041.3
~FY2051.3
Purchase area CO2 free by FY2051.3
Advance the introduction of (Deploy new-type railcars, increase introduction of renewable
energy-saving facilities
energy facilities at railway stations, etc.)
JR East's
CO2
emissions
emissions)
2.15 million
tons
Net zero
1.08 million
tons
Electricity
(92.0%)
FY2014
FY2031
FY2051
Own
power
plants
(40.0%)
The Group's
2.45 million
overall CO2
tons
emissions
Fuel
Consider line segments for
(8.0%)
Develop fuel cell railcars and conduct verification tests, etc.
Net zero
deployment
Implement electrification, etc. in step
with renewal of facilities
Reduce carbon in step with renewal of power plants and
other facilities (reduce CO2 emission factors)
Promote introduction of energy-saving facilities (deploy catenary and
battery-powered hybrid railcars)
Own power plants CO2 free by
FY2051.3 (Introduce CO2-free
hydrogen power generation)
FY2014
Introduce environmental and
FY2051
ゼロカーボン・
チャレンジ 2050
水力
AR
energy technologies to the
ZERO CARRON CHAL FKSE 2135
庫霄
Shinagawa Development Project
Realize integrated supply and
demand energy management
Photovoltaic, wind power generation,
solar thermal, earth thermal, sewage heat
biogas systems, cogeneration systems,
district heating and cooling, fuel cells
省工
FCバス
FCV
415
Fuel battery cars
Around March 2022 (planned)
Fuel cell railcars
HYBARI verification test
Ha
**
EV
CD&フリー
水氣
水氣
カーボンニュー
LNG火力発電
太陽光
BJJ
927
5841
Advance carbon-free measures at the
Kawasaki Thermal Power Station
Introduce CO2-free
hydrogen power generation
Renew the part of
facilities at FY2022
Advance the development
of renewable energy
power sources
陸上力
洋上
*
Develop with the aim
of achieving total
power output of at
least 1 million kW
Fuel battery bus
Started service:
Tokyo Around Takeshiba
From Oct 2020
24
24View entire presentation