Project Snapshot Greenfield construction and subsequent operation and maintenance of a double carriageway motorway Design, finance, build, operate, maintain and transfer concession model Total length is 38.6km Preliminary construction cost has been estimated on the basis of the existing preliminary design (which is currently being optimized) - Bare construction cost: between €380M and €450M Estimate is before VAT (17%) and savings from design optimization 30 year concession term Traffic risk to be assumed by the Government Availability payment model (details to be finalized in consultation with sponsors and lenders) AC JP Autoceste FBIH IFC International Finance Corporation World Bank Group 5