3 Gas storage level already reached 73%, with increasing security of supply for next winter season. Remaining days of gas flow assuming complete interruption Assumed Assumed day of storage filling interruption Remaining days of gas flow Assuming reduction of gas flows to 30% 73% Today 80% 30.6.22 95% 31.7.22 100% 31.8.22 100% 30.9.22 100% 31.10.22 90% 30.11.22 76% 31.12.22 43% 31.1.23 36% 28.2.23 25% 31.3.23 30% 30.4.23 44% 31.5.23 6.11.22 13.1.23 15.11.22 21.1.23 7.12.22 11.2.23 19.12.22 20.2.23 30.12.22 25.2.23 16.1.23 15.3.23 1.2.23 27.3.23 I Basic consumption level â– Consumption level 10 Q2 22 Q3 22 21.2.23 20.4.23 12.3.23 30.4.23 31.3.23 20.5.23 30.4.23 8.8.23 27.6.23 31.10.23 19.9.23 5.12.23 Q4 22 Q1 23 Q2 23 2.12.22 20.12.23 12.12.22 1.1.24 5.1.23 1.1.24 17.1.23 1.1.24 27.1.23 1.1.24 14.2.23 1.1.24 28.2.23 1.1.24 20.3.23 1.1.24 31.3.23 1.1.24 18.4.23 1.1.24 16.5.23 1.1.24 31.7.23 1.1.24 15.10.23 1.1.24 Q2 22 Q3 22 Q4 22 Q1 23 Q2 23 Example: in case of complete interruption as of today, the gas flow would last till 6. 11.2022 in basic consumption level and and till 13.11.2023 in 10th consumption level. Note: model is based on assumption that no gas supplier re-exports abroad; consumption @ level 10 shows the situation, where the gas is being delivered only to B2C customers. Example: in case of reduction of gas flows to 30% from today, the gas flow would last till 2. 12. 2022 in basic consumption level and till 20.12.2023 in 10th consumption level. gasnet.cz
View entire presentation