Fresnillo Results Presentation Deck

2021 PRELIMINARY RESULTS - PROJECTS STRONG PROJECTS FOR THE FUTURE - ORISYVO, RODEO & GUANAJUATO ORISYVO (GOLD) ● ● ● ● In 2021, we concluded a detailed metallurgical investigation, confirming good recoveries in the oxide zone and improving recovery rates in the sulphides. 70% progress in geotechnical drill programme Conceptual mining and ore processing scenarios in study. Prefeasibility study scheduled to be completed in 2023 Baseline environmental, social, energy, hydrological studies, amongst others, are on-going Expected avg. annual gold production: 140-165 koz Resource: 9.6 moz Au (based on an open pit shell) RODEO (GOLD) In 2021, we refined the preliminary economic assessments. Detailed metallurgical investigation, infrastructure and hydrological studies are on-going ● ● ● Strengthened a region-wide community relations programme In 2022, we aim to reach agreements with local communities regarding access to land Expected avg. annual gold production: 130-150 koz Resources of 1.3 moz Au, 13.8 moz Ag GUANAJUATO (SILVER / GOLD) ● ● ● ● 20 49,047 metres of core drilling was completed in 2021 Both the total and the indicated resources have increased and are approaching a critical mass which will be best evaluated in an updated PEA expected to be completed in 2023 Central Zone Resources of 1,013 koz Au, 37.9 moz Ag North Zone Resources of 437 koz Au, 19.7 moz Ag South Zone - Resources of 243 koz Au, 43.0 moz Ag
View entire presentation