Growth Unlimited slide image

Growth Unlimited

Manufacturing Facility, Hydro Power & Water Power Mech TM Growth Unlimited 27.5 MLD STP, Networking at Palwal, MCPALWAL Railway - Axil Box Housing Fibrizer Rotor - Triveni Engineering Implementation of Hydro Electric Project, 2 MW at Upper Kallar, KSEB Implementation of Hydro Electric Project (2MW/5.14 Mu)-KSEB Head stock - ISGEC Heavy Engineering 28 MLD STP at Karnal, TPL 2020/8/8 16:42 Machining of Valve outer casing. POWER MECH INDUSTRI Heavy Duty Centre Lathes (Noida) BHEL-HP Inner Casing SR Furnace (Noida) Manufacturing Unit (Noida) 37
View entire presentation