PTTEP Project Details and Financial Performance
Projects Details | Southeast Asia
Project Name
Malaysia Block K
1
- Kikeh
- Siakap-North Petai field (SNP)
- Gumusut-Kakap field (GK)
Participating Interest* (%)
Sales Vol Gas
(MMSCFD)
Sales Vol Liquid
(KBPD)
Status
Phase
OP (Kikeh & SNP)
Production
PTTEP
JV (GK)
Kikeh 56%
SNP 22.4%
GK 7.17%
18
**
25
**
Latest Status
Continued inspection and maintenance activities.
42-59.5%
223
**
15 **
On-going well hookup activities
42-56%
174 **
2
Malaysia SK309 and SK311
OP
Production
PTTEP
3
Malaysia Block H
OP
Production
PTTEP
4
Malaysia - Other projects
OP
Exploration
PTTEP
42.5 -80%
(varied by
permits)
5
Yadana
(Myanmar)
OP
Production
524
PTTEPI
37.1%
Chevron
MOGE
41.1%
21.8%
6
Zawtika: M9 & a part of M11
(Myanmar)
OP
Production
315
PTTEP
80%
Myanma Oil and
20%
Gas Enterprise
(MOGE)
Note:
PTTEP denotes respective PTTEP subsidiaries participating in the project
***
Sales volume represent average volume for 100% of the project during 3M2023
except Malaysia (Production volume 100%) / For Block K, gross production is net off unitization
Status: OP = PTTEP operatorship/JOC = PTTEP joint operatorship/JV = PTTEP Joint Venture Partner
36
PTTEP
Ensure gas delivery at DCQ
Preparing for exploration wells drilling in early 2023
SK410B Under evaluating the drilled result. For LLB, expect FID 2023.
SK417: Preparing to drill an appraisal well and evaluating prospects well.
SK405B: On-going drilling 1 exploration well.
SK438 Preparing to drill 2 exploration wells.
SK314A Under evaluating the drilled result.
SB412 On-going 3D seismic reprocessing, evaluating prospects well and
G&G study.
Major activities were completed as planned.
On-going to infill drilling study and preparation
Maintain operations
Completed 4 additional wellhead platforms and 5 appraisal wells to support
the development of future phaseView entire presentation