The steam flood pilot is designed to de-risk the reservoir performance and demonstrate commerciality
-
projected start in Q3 2012.
-
- production response estimated in 12 to 18 months
remaining pilot capital cost estimated at US$19 million and 15 months' cost of operations at US$10 million
Initial start-up uses cyclic steam ("huff and puff"). Continuous steam should begin 90 days later
Pilot design with 9 patterns - 16 producers and 9 injectors with peak production of 1,200 BOPD in 12 months - is
the best method to test the potential recovery
Full field production, upon pilot success, is anticipated to commence in 2018 with rates dependent on the
ultimate resource volumes and pilot performance
current Contingent Resource Best Case shows 150,000 bbls/day gross
current Contingent plus Prospective Best Case shows 300,000 bbls/day gross
Estimated to be over 50 years of production
Steam
Engineering
Engineering and
Construction
Government
Delay
Drilling and
Construction
Flood
Start
Pilot Operation
Analysis
Jan 10
Jan 11
14 May 2012
Jan 12
Jan 13