Investor Presentaiton slide image

Investor Presentaiton

Paplanto DIAGNOSIS OF THE GAS SECTOR Inadequate Infrastructure Overview of Pipeline Infrastructure Capacity Vs. Demand actions Installed Pipeli Capacity Egbin Agura, Ikorodu Lagos Omotosho WDdProjection ventaled Pipe B SPDC OGGS Eyzen Benin City Sapele Okpai 162 ..... Obite Gharal Afam Port Harcourt Omoku Ikot Abas Bonny Calabar Calabar Existing gas pipeline infrastructure is inadequate in capacity and reach for the current and projected demand growth. Lack of connectivity between East and West, coupled with limited throughput capacity severely constrain supplies. Whilst gas reserves are concentrated in the East, there is limited connectivity with the West where demand is concentrated. This infrastructure situation limits the flexibility of supply
View entire presentation