Investor Presentaiton slide image

Investor Presentaiton

• • Port Infrastructure Avatiu Harbour recently completed a redevelopment. It was handed over to the Port Authority on time on 23 August 2012. The larger vessel 116 m LOA did in fact make a call on 12 August prior to handover, as the harbour basin dredging was at that time completed to the design depth.
View entire presentation