Investor Presentaiton
SALINAS PROJECT
LITHIUM
• LITHIU
SALINAS
PROJECT
APRIL 2024 MINERAL
RESOURCE ESTIMATE
M&I:
5.86Mt grading 1.09% Li₂O
(159kt LCE)
Inferred:
8.90Mt grading 0.97% Li₂O
(215kt LCE)
OP+UG; 0.5% Li20 cut-off
■
As per GE21:
Near-term potential to
add 10-15Mt at Salinas
with grades ranging
from 1.0-1.3% Li20
PEA for Salinas
underway by GE21;
completion expected in
H2 2024
See press release dated April 4, 2024
Lithium Ionic (MGLIT)
Mineralized Pegmatites
Soil Anomalies
Access Road
SALINAS
PROPERTIES
8210000-
0
810000
km
63.49Mt at 1.31% Li₂O
Latin Resources'
Colina Lithium Deposit
Noé
Zoé
Sobradinho
Oeste.
Cubo
km
807000
808000
809000
10000
11000
212000
Elev (2)
Oeste
Sobradinho
Cubo
+800-
+600
+400-
200
+0
215500
+8215000
+810000
+809500
+8214500 +808000
+808500
+809000
SIRGAS 2000 UTM 23S- April 2024
MGLIT Drillhole
Neolit Drillhole
SRP Pegmatites
Potential pegmatite extensions
based on identified outcrops
Soil Anomalies
Claim Boundary
Access Road
813000
+810500
Plunge +06
Azimuth 020
S
0 100 200 300
N
8218000-
CLASS
8217000-
8215000-
8214000-
Measured
Indicated
Inferred
+81100
19View entire presentation