Investor Presentaiton slide image

Investor Presentaiton

SALINAS PROJECT LITHIUM • LITHIU SALINAS PROJECT APRIL 2024 MINERAL RESOURCE ESTIMATE M&I: 5.86Mt grading 1.09% Li₂O (159kt LCE) Inferred: 8.90Mt grading 0.97% Li₂O (215kt LCE) OP+UG; 0.5% Li20 cut-off ■ As per GE21: Near-term potential to add 10-15Mt at Salinas with grades ranging from 1.0-1.3% Li20 PEA for Salinas underway by GE21; completion expected in H2 2024 See press release dated April 4, 2024 Lithium Ionic (MGLIT) Mineralized Pegmatites Soil Anomalies Access Road SALINAS PROPERTIES 8210000- 0 810000 km 63.49Mt at 1.31% Li₂O Latin Resources' Colina Lithium Deposit Noé Zoé Sobradinho Oeste. Cubo km 807000 808000 809000 10000 11000 212000 Elev (2) Oeste Sobradinho Cubo +800- +600 +400- 200 +0 215500 +8215000 +810000 +809500 +8214500 +808000 +808500 +809000 SIRGAS 2000 UTM 23S- April 2024 MGLIT Drillhole Neolit Drillhole SRP Pegmatites Potential pegmatite extensions based on identified outcrops Soil Anomalies Claim Boundary Access Road 813000 +810500 Plunge +06 Azimuth 020 S 0 100 200 300 N 8218000- CLASS 8217000- 8215000- 8214000- Measured Indicated Inferred +81100 19
View entire presentation