Endeavour Mining Results Presentation Deck
HOUNDÉ MINE, BURKINA FASO
Focused on Sianikoui and Dohoun, and Vindaloo South targets
Houndé map
INSIGHTS
> An exploration programme of $14.0 million is planned for
FY-2022, of which $2.1 million was spent in Q1-2022
consisting of approximately 6,500 meters of drilling across
69 drillholes. The exploration programme was focussed on
following up on historic drilling results at Sianikoui and
Dohoun, and extending the mineralised trend at Vindaloo
South.
> During Q1-2022 drilling at Sianikoui identified three
mineralised trends, with further drilling results pending,
mineralisation remains open to the north and the south.
Drilling at Dohoun is testing the extension of mineralisation
to the southwest, with further drilling planned in Q2-2022.
At Vindaloo South diamond drilling was used to delineate
the geology and identify the mineralised trend towards the
south of the existing mineralisation.
> During Q2-2022, drilling will continue at Sianikoui and
Dohoun to test the mineralised trends that have been
identified. Similarly, exploration programmes are planned
at the Grand Espoir, Baraki, Banana, Tioro Sud and Hondjo
targets to delineate these prospects. At the Mambo
discovery, step-out drilling will focus on extending the
mineralised trend to the northeast to fully evaluate the
potential size of the Mambo deposit.
AZK
Kari West
0
Bombi
Grand Espoir
Bouere
1.8.
Dohoun
Kari Center
RN1
¡Sia/Sianikoui
Kari Pump
Nema
Soukou
Plant
Tailings
Storage
Facility
Waste Dump
Mambo
Existing Highway
------------------
Existing Powerline
Vindaloo
-Koho
Kari Fault
ENDEAVOUR
MINING
RN1
Kopoi
Deposits
Targets
km
Dossi
37
10View entire presentation