Panasqueira Tungsten-Tin Mine Presentation
STRATEGIC ASSET: UNLOCKING THE VALUE OF OUR MOLYBDENUM RESERVES
A ALMONTY
CURRENT STRENGTH
STRATEGIC MOLY PROJECT: 6 REASONS TO BOOST
OVERALL COMPANY WORTH
POTENIAL STRATEGIES
ALMONTY IS CURRENTLY EVALUATING 4 STRATEGIES
TO ENHANCE THE COMPANY VALUE*
1
FULLY PERMITTED
Orebody located in the same permitted area as Sangdong, ensures efficient
development and regulatory compliance
2 ADJACENT TO SANGDONG
3
The orebody is characterized by both easy future access and cost-efficient
exploration due to its location
SIGNIFICANT UPSIDE
Open orebody in all directions; more drilling is needed to understand the full
scale which will be acquired during the early mine phase of Sangdong
4 HIGH GRADE
Among the highest grades observed, yet the source of the material remains
unidentified
5 STAND-ALONE MINE
6
Almonty's high-grade molybdenum project stands alone, contrasting with
lower grades in other mines
POTENTIAL SYNERGIES
Proximity to Sangdong Tungsten creates powerful synergies that could
significantly elevate the project's impact
ALMONTY
Spin-out of the Moly Deposit
into a separate entity
Potential of a strategic
cornerstone investor
Organic growth with the cash
flow from Sangdong
Joint-Venture
*Visualization of different scenarios. No indication is being made of what will happen with the project
fin
19View entire presentation