Investor Presentaiton slide image

Investor Presentaiton

US-ABWR Design and SECY-12-0025 Issues SECY-12-0025 Issues: Tier 1 Activities 2.1 Seismic and flooding reevaluations 2.3-Seismic and flooding walkdowns - 4.1 Station Blackout (SBO) regulatory actions 4.2-Mitigating strategies for beyond design basis events 5.1-Reliable hardened vents for Mark I and II containments 7.1-Spent fuel pool instrumentation 8- Strengthen & Integrate EOPS, SAMGS, & EDMGS 9.3-Enhanced EP staffing and communications TOSHIBA Copyright © 2012 Toshiba Corporation. All rights reserved. Leading Innovation >>> 11
View entire presentation