MOTAENGIL Total capex of €107 mn in 1H19 ■ The E&S capex was mainly driven by: (i) the Energy business in Mexico (€38 mn) due to the development of Jorge Luque first phase (Gas Power Plant) and the construction works of Bordo Poniente landfill; (ii) the waste activity in Ivory Coast (€14 mn) and the E&S activity in Europe (€22 mn) ■ Growth and long term contracts capex accounted for 63% of the total capex ■ Guidance of capex in the high end of the range of €150 mn-€180 mn Net capex (€ mn) 111 Capex in 1H19 by region (€ mn) 47 3 107 40 51 16 22 36 33 26 26 7 38 13 53 20 13 E&C Capex 1H19 Capex long term contracts¹ 1H18 E&S Capex ¹Includes mining contracts in Africa and the Energy business in Latin America. Europe Maintenance Africa Growth 6 Latin America Capex long term contracts¹ 1 Others 12