CEZ Group plans to increase generation in renewables, nuclear
and gas
Nuclear
•
We will safely increase generation volume in
existing plants above 32 TWh on average in 2030
and achieve 60-year operating life.
We will build a new nuclear power plant in Dukovany.
We will prepare for potential construction of small
modular reactors (SMR) after 2050 with total capacity
of 3000 MW with the goal of starting first SMR in 2032.
Renewables
We will build 1.5 GW of renewables by 2025 and
6 GW renewables by 2030.
• We will increase installed capacity of electricity
accumulation to at least 300 MWe by 2030.
S Traditional
•
We will decarbonize heating and will transform our
coal locations to new activities.
We will build new gas capacities, which will be ready
for hydrogen combustion.
www.cez.cz/en
Electricity generation of CEZ Group
(Existing assets, in TWh)
54.3
17.5
Π
57.0
6.5
Coal
10.0
Gas
6.4
Renewables
3:3
2.2
Hydro
2.1
32.0
31.0
Nuclear
2022
2030
CO2 free generation (in %)
63%