Investor Presentaiton slide image

Investor Presentaiton

3 Li Lithium 6.941 PHILLIPS RIVER LITHUIM PROJECT RAVENSTHORPE, WA Project Highlights ✔ Strategically located -2.5km East of Bulletin Resources' (ASX:BNR) Phillips River South project with numerous rock chip results exceeding exceeding 2% Li₂O(1,2) High-resolution aeromagnetic survey completed in early 2023 Progressing towards auger and RAB drilling on for the 1H 2024 1- https://www.bulletinresources.com/wp-content/uploads/2023/10/BNR SouthwestConnect FINAL.pdf 2- BNR announcement dated 4 October 2023, "EPA's Greenlight Allows Bulletin's Drilling Applications to Proceed" Project Location Porth -6,270,000 mN SUMMIT SMMINERALS LTD 770,000 ME 780,000 mE Phillips River Lithium Project 6,260,000 mN Mt Cattlin 6,280,000 mN Phillips South Recent BNR Discovery LEGEND SM SUMMIT MINERALS Phillips River Project E74) E 74/689 Summit Tenement Proposed Auger Sample Mine MINERAL OCCURRENCE Gold ○ Industrial Pegmatite Minerals Copper Lead - Zinc Dimension Stone Tin-Tantalun - Li MINERAL OCCURRENCE Proterozoic Mafic Instrusive Maydon Basalt Chester Formation Mount Barren Group Annabelle Volcanics Manyutup Tonalite South West Terrane Greenstones Bandalup Ultramafics Northern Foreland Metagranitic YILGARN CRATON GRANITES 770,000 ME 2005 11
View entire presentation