Investor Presentaiton slide image

Investor Presentaiton

Tackling The Key Challenge Of SO2 Emissions In Polar Division implements a system of measures aimed at reduction of SO2 emissions to Maximum Permissible Emissions which includes: ■ Development of the concentration facilities of the Talnakh Concentrator in order to maximize sulphur percentage in final tailings without losses of valuable metals Modernization of pyrometallurgical processing facilities of the Nadezhda Metallurgical Plant and shutdown of the main facilities of the Nickel Plant situated in the immediate vicinity of the residential areas being a source of weak sulfureous gas which is difficult to recycle In June 2012, MMC Norilsk Nickel signed contract with Techint S.p.A (Italy) to develop design documentation with simultaneous specification of technical parameters at pilot facilities and consequent construction of sulphur recycling and storage facilities with a total capacity of up to 950 thousand tons per annum. The total amount of CapEx for the project is USD1.7 bn SO₂ emissions at Polar Division 7 000, 2,011 2004-2011: - 5% 1,955 1,950 1,939 1,920 1,917 1,912 1,881 2004 2005 2006 2007 2008 2009 2010 2011 NORILSK NICKEL GREENPEACE 30 30
View entire presentation