Energizing the Future

9 Upgrading our infrastructure and reducing methane emissions Estimated replacement miles remaining Miles of pipeline replaced (By fiscal year) (As of 12/31/21) Total Bare steel¹ Cast Vintage replacement iron¹ plastic 400 356 382 362 322 miles 297 300 Missouri 1,4922 481 1,973 Alabama 478 370 271 1,119 200 Mississippi 436 - 436 100 Total 2,405 851 271 3,527 % of total 68% 24% 8% 100% 1Completion expected in 15+ years. 2Includes bare steel mains and services; threaded and coupled steel main. Damages (Per 1,000 locates) 4.78 4.24 3.87 3.89 3.74 2017 2018 2019 2020 2021 Leaks (Per 1,000 system miles) 99.7 75.6 60.4 48.8 31.8 2017 2018 2019 2020 2021 2017 2018 2019 2020 2021 Spire | Investor presentation - August 2022