Investor Presentaiton slide image

Investor Presentaiton

Integrated Production Path Plant & Infrastructure to be located at Fountain Head 10200 N • • Proposed integrated Plant capable of treating: Updated Fountain Head (FH) MRE 2.94 Mt @ 1.7 g/t Au for 156,000 oz Au (Indicated and Inferred)1 NW Breccia (new resources) Boundary of block model at 0.3 g/t Au cut off Fountain Head Local Grid North 100 200 m MGA Grid North 10100 N 10000 N Fountain Head West Fountain Head East FH Far East (new resources) • Zinc-gold-silver sulphides from Hayes Creek • Free milling/oxide gold/silver ore from Glencoe/Mt Porter/FH Fold Axis 9800 N Green energy component, up to 41% renewable power from solar and battery energy storage system 9700 N MLN1034 MUNA Tally Ho (new resources) Central East ML31124 ய 9600 N 9700 E 9800 E 10300 E • Located in existing infrastructure corridor with rail, gas, power and other mining operations, 170km from Darwin • No close process infrastructure in the region • • Agnico Eagle Mill under care & maintenance ~63km by road from FH Opportunities to expand Project footprint and incorporate third-party mill feed opportunities, i.e., Mt Porter • Extensional zones of open gold mineralisation adjacent to Plant, over >1.6km strike along the FH anticline 1. See Appendix for further details including Full Mineral Resources PNZ METALS 769000 Ban Springs Road 769500 770000 770500 North Topsoil ANE Shed Core Shed Mining Contractors Yard West Topso Offices & Mine Workshops cess Only ROM & Crusher Magazines 771000 771500 772000 772500 Evaporation Dam PAF Stockpile Fountain Head Pit LG Stodple ILG Stockpile2 Integrated Waste Landform (W) Tailings East Topsoil Adelaide to Darwin Railway 66kV Pine Creek to Cosmo Powerline 771000 771500 772000 772500 769000 769500 770000 770500 16
View entire presentation