Investor Presentaiton
Integrated Production Path
Plant & Infrastructure to be located at Fountain Head
10200 N
•
•
Proposed integrated Plant capable of treating:
Updated Fountain Head (FH) MRE 2.94 Mt @ 1.7 g/t Au for 156,000 oz Au
(Indicated and Inferred)1
NW Breccia
(new resources)
Boundary of block model
at 0.3 g/t Au cut off
Fountain Head
Local Grid North
100
200 m MGA Grid
North
10100 N
10000 N
Fountain Head West
Fountain Head East
FH Far East
(new resources)
•
Zinc-gold-silver sulphides from Hayes Creek
• Free milling/oxide gold/silver ore from Glencoe/Mt Porter/FH
Fold Axis
9800 N
Green energy component, up to 41% renewable power from solar and
battery energy storage system
9700 N
MLN1034
MUNA
Tally Ho
(new resources)
Central East
ML31124
ய
9600 N
9700 E
9800 E
10300 E
• Located in existing infrastructure corridor with rail, gas, power and other
mining operations, 170km from Darwin
• No close process infrastructure in the region
•
•
Agnico Eagle Mill under care & maintenance ~63km by road from FH
Opportunities to expand Project footprint and incorporate third-party mill
feed opportunities, i.e., Mt Porter
• Extensional zones of open gold mineralisation adjacent to Plant, over
>1.6km strike along the FH anticline
1. See Appendix for further details including Full Mineral Resources
PNZ
METALS
769000
Ban Springs Road
769500
770000
770500
North Topsoil
ANE Shed
Core Shed
Mining Contractors Yard
West Topso
Offices & Mine Workshops
cess Only
ROM & Crusher
Magazines
771000
771500
772000
772500
Evaporation Dam
PAF Stockpile
Fountain Head Pit
LG Stodple ILG Stockpile2
Integrated Waste Landform (W)
Tailings
East Topsoil
Adelaide to Darwin Railway
66kV Pine Creek to Cosmo Powerline
771000
771500
772000
772500
769000
769500
770000
770500
16View entire presentation