Bemolanga Future Steps Madagascar Oil and Total will: ā—‰ - - Pursue deep plays. Conduct 8600 km of airborne FTG gravimetric survey to determine potential basement structures Assess need for seismic acquisition. The PSC will extend the current phase by one year and allow for an additional 2 year extension to drill an exploratory well. Continue assessing the mining potential Norwest to fully analyze the 2010 mine data and update the bitumen PIIP assessment. Based on preliminary observations, volumes will not likely change significantly from the 2009 data analysis. Continue to research the Taciuk ATP retort process to determine if it has the potential to improve both economics and mine extraction performance. 17 June 2011 Investor Update hola ng a Proposed 2010 FTG Survey MADAGASCAR OIL 2010 FTG Survey 19 tot 16