What went wrong and how can we do it differently? Focus: Improve process recovery rate to >95% ◉ Cut 2 pit extension to access high grade material 1 ■ Optimize newly installed secondary crushing circuit Implement an autogenous milling circuit to improve diamond liberation Result: Improved quality, less diamond damage and size distribution of stones unlocking higher pricing potential (Nov 2011: stones > 2 ct sold for $ 1200/ct) tangomining Focus: ☐ Improve cost efficiency to below US$11/t levels Tie in installed grid power to replace diesel generator power system ◉ Support outsource model on mine face extraction ◉ Utilize deferred tax assets US$45M 2 ■ Autogenous milling can reduce operating cost and increase throughout Result: Improve on historical cost to US$10.20/t estimate November 2011: 2 ct stones recovered of high color and quality @ $1,200/ct Current Pit BK11 East 食 N Cut 2 Extension 3 Focus: ■ Extend life of mine to > 10 years Access additional Orapa kimberlite targets through presence and local influence Improve resource confidence through mining activities waste stripping estimate 926,719t TGV.TSXV 12
View entire presentation