En+ Group Investment Presentation
Power Segment's HPP Modernisation Programs
Ent
GROUP
•
'New Energy' is an ongoing program, focused on modernising the power plants at
Angara and Yenisei cascades, to improve efficiency, reliability and safety, as well as
reduce potential GHG emissions by augmented HPP generation
• As part of the program:
.
Ust-Ilimsk: 4 runners replaced
•
Krasnoyarsk: all 12 hydraulic units and 2 runners replaced
•
.
•
•
•
Bratsk: 12 out of 18 runners replaced
Irkutsk: upgrade began in July 2019. Under the modernisation programme,
1 generation unit replaced in 2020 and 3 of the 8 hydropower units installed
at the plant will be replaced by 2023
Investment is expected to total RUB 21 bln in the period to 2026 (c. USD 290.2
million as of 30 June 2021), including funds already invested in the project¹
Modernised HPP turbines offer increased efficiency and better cavitation. From
2022 the Group's HPPs are expected to increase their clean electricity generation
by 2 TWh, from the same volume of water
The upgraded equipment at the Group's Bratsk, Ust-Ilimsk, Irkutsk and
Krasnoyarsk HPPs supported an increase in hydropower production of 936.3 GWh
in 1H 2021, helping to prevent greenhouse gas emissions by approximately 1,085
thousand tonnes of CO2e due to the partial replacement of prior thermal power
generation volumes
(1) Calculated based on USD/RUB exchange rate 72.37 as of 30.06.2021.