Investor Presentaiton slide image

Investor Presentaiton

2. State of the Power Sector during FY2021 2.1 Overall state of the power sector in FY21 . The success of the power sector has been described with basic facts on installed capacity, per capita generation, access to electricity and system loss etc • Grid sub-station Power sector in 2021& Its target for 2030 2021 2030 Installed capacity (MW) 25227 40000 Consumers (mil.) 40 Trans. Lines (ckt km) 12744 28320 Dist. Lines (km) 612000 660000 26000 59000 (2024) 8.73% 514 kwh 99.5% Source: Power Cell, MoPEMR Baseline Target Target Target Target Target (FY2020) (2021) (2022) (2023) (2024) (2025) 23,548 24,000 26,000 28,000 29,000 30,000 Considerable progress has been made in ensuring access to electricity Installed capacity increased to 25227mw, p/c generation 514kwh and access to electricity reached 99.5% Following that trend, 8th FYP put focus on further enhancement of generation capacity mainly based on fossil-fuel Installed Generation Capacity (MW) RE-based power generation Dis. loss Per capita generation Access to electricity Power sector in the 8th FYP Solar 127 542 895 400 50 2,014 Wind 60 230 10 300 Waste to Energy 6 42 48 Total 127 608 1,167 400 60 2,362
View entire presentation