2. State of the Power Sector during FY2021
2.1 Overall state of the power sector in FY21
.
The success of the power sector has been
described with basic facts on installed
capacity, per capita generation, access to
electricity and system loss etc
•
Grid sub-station
Power sector in 2021& Its target for 2030
2021
2030
Installed capacity (MW)
25227
40000
Consumers (mil.)
40
Trans. Lines (ckt km)
12744
28320
Dist. Lines (km)
612000
660000
26000
59000
(2024)
8.73%
514 kwh
99.5%
Source: Power Cell, MoPEMR
Baseline
Target
Target
Target
Target
Target
(FY2020)
(2021)
(2022)
(2023)
(2024)
(2025)
23,548
24,000
26,000
28,000
29,000
30,000
Considerable progress has been made
in ensuring access to electricity
Installed capacity increased to
25227mw, p/c generation 514kwh and
access to electricity reached 99.5%
Following that trend, 8th FYP put focus on
further enhancement of generation capacity
mainly based on fossil-fuel
Installed Generation Capacity (MW)
RE-based power generation
Dis. loss
Per capita generation
Access to electricity
Power sector in the 8th FYP
Solar
127
542
895
400
50
2,014
Wind
60
230
10
300
Waste to Energy
6
42
48
Total
127
608
1,167
400
60
2,362View entire presentation