Investor Presentaiton
SUM20-10
469
2.0m
inc.
1,437
0.5m
Looking to the northeast
Ruby Discovery Area
*AgEq is calculated using US$20/oz Ag, US$1,800/oz Au, with
metallurgical recoveries of Ag - 90% and Au- 95%. AgEq = (Ag
grade x Ag recovery)+((Au grade x Au recovery) x (Au price / Ag
price)). True thicknesses are estimated to be 70-80% of drilled
intercept length.
Silver and gold grades comprising AgEq are listed on page titled
"Hughes Property Drilling" in this presentation
1.4 km
inverted 3D chargeability and resistivity model
Chargeability - High
Chargeability - High
Undrilled Targets
Summa Silver Corp. | TSXV:SSVR | OTCQX:SSVRF Frankfurt: 48X
Resistivity - High
LEGEND
SUM21-XX
450
11.6m
Drill Hole intercepts
> 100 g/t AgEq
g/t AgEq*
Intercept Length
Page 22View entire presentation