Investor Presentaiton
NEAR TERM STRATEGY: THIRD PARTY INFRASTRUCTURE
SMB Batafong Mining Area
and existing mining infrastructure
Woula Mining Areas
New Haul Road
10km
SMB Haul Road
Legend
Regional Roads
Rail
Mining Areas
Woula - Research Permit
Katougouma River Port
Kilometers
0
2.75
5.5
11
16.5
22
Boke
600 000mE
父
620000mE
Lindian Resources Bauxite
Exploration Licences
Bauxite Mining Licences
Operating Bauxite Mine
Bulk Haulage Railway
Bulk Haulage Railway
(under construction)
Proposed Haul Road
Road
640 000mE
660 000mE
680 000mE
to Gaoual
GAOUAL PROJECT
83.8Mt (indicated, >45% Al203 cut-off)
(58.4% Al203, 2.8% SiO2 after screening)
Gaoual Licence
(Lindian)
-1260000mN
Rusal (3Mt pa)
-1240 000mN
Rusal
GAC
CBG
CBG (13Mt pa)
GAC (IMt pa)
Henan
1200000mN Dapilon
to
Port
CBG
Railhead
CBG
Sangarédi
SMB
Q
SMB (mine under construction)
SMB
Railhead
AGC
Proposed
Haul Road
LINDIAN
RESOURCES LTD.
25 kilometres
Télimélé
The Woula Project is a low Capex, early production opportunity: ~10km from an existing haul road connecting to the
bauxite export terminal of Katougouma
The High-Grade Gaoual Conglomerate Bauxite Project is approximately 100km from the SMB and CBG railheads
7View entire presentation