NEAR TERM STRATEGY: THIRD PARTY INFRASTRUCTURE SMB Batafong Mining Area and existing mining infrastructure Woula Mining Areas New Haul Road 10km SMB Haul Road Legend Regional Roads Rail Mining Areas Woula - Research Permit Katougouma River Port Kilometers 0 2.75 5.5 11 16.5 22 Boke 600 000mE 父 620000mE Lindian Resources Bauxite Exploration Licences Bauxite Mining Licences Operating Bauxite Mine Bulk Haulage Railway Bulk Haulage Railway (under construction) Proposed Haul Road Road 640 000mE 660 000mE 680 000mE to Gaoual GAOUAL PROJECT 83.8Mt (indicated, >45% Al203 cut-off) (58.4% Al203, 2.8% SiO2 after screening) Gaoual Licence (Lindian) -1260000mN Rusal (3Mt pa) -1240 000mN Rusal GAC CBG CBG (13Mt pa) GAC (IMt pa) Henan 1200000mN Dapilon to Port CBG Railhead CBG Sangarédi SMB Q SMB (mine under construction) SMB Railhead AGC Proposed Haul Road LINDIAN RESOURCES LTD. 25 kilometres Télimélé The Woula Project is a low Capex, early production opportunity: ~10km from an existing haul road connecting to the bauxite export terminal of Katougouma The High-Grade Gaoual Conglomerate Bauxite Project is approximately 100km from the SMB and CBG railheads 7
View entire presentation