Investor Presentaiton
Australian
VANADIUM
LIMITED
Optimised Feasibility Study focuses on realising economic benefits
Concept: Unrestrained use of orebody delivers opportunity to improve concentrate, delivering
improved capital expenditure (CapEx) and operating expenditure (OpEx) for better project economics
•
•
CapEx
Processing: Potential for smaller concentrator and
processing plant with similar vanadium output
Infrastructure: Potential to reduce scale of power and
water infrastructure
Simplification: Low silica ore offers opportunity to
further simplify flowsheet
•
•
OpEx
Mining: Mine schedule optimisation may reduce material
movement and mining costs
Grade & Recovery: Higher vanadium and lower silica grade
in concentrate has potential to reduce operating costs via
lower reagent, energy, power and water consumption
Coproducts: Opportunity to increase iron grade above 60%
and opportunity to improve ilmenite grade has the potential
to increase coproduct credit contributions
Bankable Feasibility Study (BFS) metrics (prior to merger and optimisation): AVL conducted a BFS
in April 2022¹ with the following metrics:
Annual Production
11,200t V₂05
Pre-production CapEx
US$435M
C1 OpEx
US$4.43/lbv₂05
Mine life
25 years
The aim for the OFS is to improve on these metrics
1: Information within this slide as detailed in ASX Announcement "Bankable Feasibility Study for Australian Vanadium Project" dated 6 April 2022. All material assumptions underpinning the production target
and forecast financial information derived from a production target continue to apply and have not materially changed
Corporate Presentation | March 2024 | ASX:AVL