Investor Presentaiton slide image

Investor Presentaiton

| Manufacturing Industry Indonesian electric vehicle industry development roadmap progress Status 2020 2021 2022 2023 MHP nickel-cobalt refinery of EV battery upstream sector leads the charge in achieving the government's electric vehicle industry roadmap • Indonesia's growing nickel production sector is well-positioned to meet the demand for nickel-based batteries for EVs, driven by the Indonesian government's ban on nickel ore exports of ore with Ni content <1.7% (MEMR Regulation 11/2019). This has encouraged industries to invest in hydrometallurgical nickel refining facilities in the country, with at least 2 operating High Pressure Acid Leach (HPAL) nickel refineries and 5 more planned. The current HPAL facilities require 9.14 megaton/year of saprolite ore. Upon completion of the planned facilities, the total saprolite demand could reach 50.6 megaton per year, and the demand for limonite (<1.5% Ni) could reach 1.2 megaton per year. • The existing HPAL facilities have the capacity to produce 386 kiloton/year of mixed hydroxide product (MHP). Upon completion of the constructed HPAL facilities, total MHP production is expected to increase by 657 kiloton/year, NiOH by 316 kiloton/year, which will be continued into 136 kiloton/year of nickel sulfate and 19.5 kiloton/year of cobalt sulfate. • One of the refining industries is utilizing a proprietary technology and method, namely the Step Temperature Acid Leaching (STAL) modular reactor. The plant is planned to commence operations in Q2 2025, utilizing limonite ore with around 1.5% Ni content to produce MHP. The technology developer, a subsidiary company, is also exploring the potential of acid leaching and NCM technology to further process the MHP into NCM precursors. MHP Production (HPAL Smelter) NiSO4 & COSO4 LIB & NiMH Cylinder Type Cell BMS (Assembly) Battery Pack Assembly Passive BMS (On track) 387 kiloton MHP production (current), 55 kton MHP in Q1 2025, 7.3 kiloton MHP in Q1 202 *also 647 kiloton MHP (under construction) and 174 kton MHP (planned) with N/A timeline (Delay) 16 kiloton in NiSO4 Q3 2025 (Dragon) *also 136 kiloton NiSO4 & 19.5 kiloton CoSO4 (under construction) with N/A timeline (Delay) 15 GWh (NMC) in Q1 2026, *~3 MWh (LFP) have produced, N/A GWh will be groundbreaking in Q1 2023 N/A for commercial *prototypes by academia (On-track) Some EV manufacturers. assemble the battery cells LIB & NiMH Recycling Non-permanent magnet motor eff 85% (Delay) Planned in Q3 2025 for 20 kiloton LiB *ready in lab scale N/A Permanent magnet motor eff 85% >95% inverter efficiency (high power density) Indonesia Electric Vehicle Outlook 2023 (On track) BLDC 5kW for E2W since 2018, 0.8 kW for E3W since 2021, PMSM 3 kW, 4 kW, 20kW, 40 kW (rated) by local SME N/A AC Level I and Level II Charger & DC Fast Charger (On track) AC 7 kW & 22 kW (Type 2), DC fast 50 kW and ultrafast 150 kW (ChAdeMO, CCS2, include Type 2 AC) since 2019 Sources: Mol Regulation 6/2022, APNI (2022), IESR analysis 28 28
View entire presentation