Investor Presentaiton slide image

Investor Presentaiton

EL EDEN Buenavista Section Resistivity L-2000N 800 700 600 Andesite Tuffs 500 400 chargeability WC- resistivity - set - INTERPRETATION GEOLOGICAL INTERPRETATION 800 Dacite Dike Buenavista Structure Andesite Tuffs Limestones IPE-15 7 IPE-14 IPE-10 ? ? RESISTIVITY TRUE DEPTH SECTION -200 -400 500 CHARGEABILITY TRUE DEPTH SECTION INDUCED POLARIZATION SURVEY Pole-Dipole na 0 a00 m 700 n 1 to 10 Plot Point Transmitter: TX-kW10, Walcer Geophysics 600 500 Receiver: GRX8-32, GDD Instrumentation Limestones 400 very strong strong moderate whak conductive very conductive Laxe resistive very resistive MC 950.0 File NOB $75.0 ME 525.0 4750 CENTENARIO GOLD CORP WWW.CENTENARIOGOLD.COM 275.0 325.0 275.0 2250 15 125.0 75.0 250 (Ohm) 23 0.5 very wesk 50 inversion RES2DINV™ Scale 1:5000 100 150 (meters) CENTENARIO GOLD CORP. EDEN PROJECT DURANGO STATE MEXICO Interpreted by Verilled by: Surveyed by: Date: Ret Line 2000N Joël Simard, Geo/Geoph Joel Simard, P.Geo/Geopl Gerardo del Val 2021/2022 220521 TMC EXPLORACIÓN 16
View entire presentation