Investor Presentaiton slide image

Investor Presentaiton

Organic Growth - Simberi sulphide Sulphide Oxide Oxide Sulphide St Barbara LIMITED Oxide Simberi - Sorowar pit - 13 Aug 2015 (oxide ore being mined, exposing the sulphide wall behind) Simberi schematic cross section - oxide mining is a pre-strip for sulphide mining Sulphide mining at Simberi potentially extends life based on existing reserve, open at depth¹ Simberi oxide mine life ~3 years¹ Oxide mining pre-strips for sulphide mining Current Mining lovel Oxide Pit Design Sulphide Pit Design St Barbara Simberi Operations Sulphide Transition Oxide > Reserves of 19.9 Mt @ 2.0 g/t Au for 1.3 Moz² contained gold with further drilling planned. Schematic showing a theoretical oxide/sulphide pit design > Processing options being considered, favouring a low capex flotation circuit, with export of a concentrate 1. Refer ASX announcement 20 October 2015 "Quarterly Report Q1 September 2015" 2. 22 / Asia Investor Relations Roadshow / March 2016 Refer ASX announcement released 25 August 2015 titled 'Ore Reserves and Mineral Resources Statements 30 June 2015'.
View entire presentation