Unique opportunity to accelerate growth based on a utility offtake agreement and strong residential business Expected available nameplate capacity, volume produced [GW] Nameplate EOY Produced (Achieved/Expected) 1.4 1.0 1.0-1.2 3.01 Approximately 3 GW nameplate by EOY 2024 with approximately 1/3 utility and 2/3 residential split Approximately 1.4 GW cumulative capacity at the Thalheim (cell) and Freiberg (module) sites currently being prepared, with ~1 GW installed and currently in ramp-up and remainder planned to become operational and 2023 Immediate continuation of expansion to approximately 3 GW planned at Thalheim and Goodyear (AZ) sites (approximately 1 GW utility, 0.5 GW rooftop), expected to become operational in 2024, subject to financing 0.321 2022A 1) Approximate capacity MEYER BURGER 2023E 2024E 17