Investor Presentaiton
Continued growth in Transmission and Mobility
Industrial growth picking up slowly
SIEMENS
Siemens relevant sectors
Projected timeline for
CAPEX pickup
Today
A
Future
Current status and future outlook
Transport
•
•
Railways current focus on 'network decongestion' over 'network expansion'; and safety projects
USD 37" bn of projects expected from FY17-20 (USD 8"5 for products e.g. Rolling stock, Signaling etc)
Power T&D
AC transmission capacity addition on track; HVDC, FACTS and 765 kV AC to be focus areas
•
100% rural electrification expected by May 2017 - one year ahead of schedule
Construction
Power Gen.
Manufacturing
•
27 Smart Cities additional cities announced taking the total number to 60 (as per schedule)
Four states (Gujarat, UP, MP, Odisha) relax land acq. laws to free up regulations for commercial use
•
State sector plans to retire 36 GW old inefficient capacity over six years; will trigger next capex cycle
Additionally India needs c. 20 GW/pa coal capacity addition to meet 7% demand growth
Revival expected to improve with good monsoon, lower rates and growth in corporate earnings
Initial indicators show jump in passenger vehicle sales, consumer credit etc
TBCB Tariff Based Competitive Bidding; HVDC High Voltage Direct Current; FACTS Flexible AC Transmission Systems; UP Uttar Pradesh; MP Madhya Pradesh
Page 5
FY 2016, Analyst PresentationView entire presentation