NHPC - Capacity Addition & Regulated Equity (Hydro) Progressive Capacity Addition 15 Progressive Regulated Equity 25000 Cap. Add. 23-24/ 2000 Cuml. Cap. 8251 MW 20000 Subansiri Lower: 2000 MW 15000 12886 Cap.Add. 21-22/ 800 MW 6251 MW Cuml. Cap. Parbati II: 800 MW Installed Capacity 5451 MW 19-20 10000 5000 FY 19-20 15885 2999 495 FY 21-22 6111 21996 1008 FY 23-24 0 2000 4000 6000 8000 10000 12000 ■Existing Regu. Eqty./Increase (Aprx.) ■Cumulative Regulated Equity Expected Additional PAT Rs. In Crore Power Station with highest generation during Q1 FY'21 : Salal (1319 MU, Annual D.E-3082 MU) एनएचपीसी NHPC