Investor Presentaiton slide image

Investor Presentaiton

SHIP POWER Construction of 137 Units: Drilling, Production and Vessels Oil Production, Brazil: 2,022- 4,200 kbpd 23 PU contracted 15 to be contracted 2 PU 3 PU 7 2 PU 7 Drilling rigs PU 7 Oil and NGL production curve (kbpd) PU 1 6. Drilling 9 Drilling rigs 2 4 PU 5 8 rigs PU PU 6 Vessel 5 PU A Drilling 8 rigs Drilling 10 5 Vessel (10) 4.200 rigs 1 4 28 Drilling Rigs 2 Vessel Drilli contracted 2 Rig 5 Vessel (17) 5 to be contracted Drilling 8 rigs 8 Vessel (15) 49 Ships contracted 8 Vessel S Vessel (20) 3 S 3 1 Vessel 5 Vessel Vessel (23) 2.500 S (9) (12) 2.022(1) (21) (9) Construction of 38 Production Unit (PU) up to 2020 50 Drilling Rigs up to 2020 49 Ships up to 2020 2011 2012 2013 2014 2015 2016 2017 2018 Petrobras' CEO presentation 20th September 2012 © Wärtsilä 2019 2020 WÄRTSILÄ
View entire presentation