Goldboro 2021 Feasibility Study: A Robust Open Pit Project slide image

Goldboro 2021 Feasibility Study: A Robust Open Pit Project

Significant Mineral Resource Growth Since Acquisition 3,200,000 2,700,000 Probable Reserves of 1,150,200 ounces of gold (15.8 million tonnes @ 2.26g/t Au) 2,200,000 1,700,000 1,200,000 700,000 200,000 2017 -300,000 g/t 7.5 6 4.5 3 1.5 0 TSX: SGNL | OTCQX: SGNLF 2018 2019 Mar-21 Dec-21 UG M+I UG Inferred OP M+I OP Inferred 2017 2018 2019 UG Average Grade Mar-21 Dec-21 O-OP Average Grade • • • SIGNAL -GOLD- High Quality Mineral Resource A total of 121,540 metres of diamond drilling, including 55,803 metres conducted by the Company 681 surface and underground drill holes Use of Bulk Sample Data and historical workings to determine plunge Recognition of significance of disseminated mineralization Use of Dynamic Anisotropy Constrained open pits were designed using only Measured and Indicated Resources Continued Potential for Further Resource Growth Infill Drilling from March 2022 targeted in-pit Inferred Mineral Resources to upgrade categorization and potentially increase revenue and reduce stripping ratio Completed 50 Line Km IP Geophysical survey to target extension of the deposit along strike to the west of the existing Mineral Resource Largest ever growth exploration programs of 12,000m currently drilling to the west of the current mineral resource throughout the summer 2023 5
View entire presentation