Investor Presentaiton slide image

Investor Presentaiton

NTPC Group: Pan India Presence Share of Installed Capacity (*as on March 31,2017) 16% 84% Rammam (120MW) (610MW) Bongaigaon (750MW) *Rest of India 276350 MW *NTPC (Group) 50498 MW Koldam 800MW Dadri (817MW Dadri Solar PV (5MW) Faridabad (430MW +5MW Solar Lata Tapovan (171MW). Tapovan Vishnugad (520MW) NCTPP (1,820MW) Unchahar (1,550MW) & (10 MW Solar) Badarpur (705MW). Jhajjar (1,500MW) Auraiya (652MW) Bhadla (260 MW)O Anta (413MW) Mandsaur (250 MW)O Tanda (1760 MW) Kanti Nabinagar(1,000MW +1980 MW) Kahalgaon (2,340MW) Meja (1,320MW) Singrauli (2,023MW) 50 MW Barh 3,300MW Rihand 3,000MW Farakka 2,100MW Durgapur Daralipali (120+40MW) (1600MWalcher Kaniha Khargone Vindhyachal (4,760MW) Rourkela NKP 1980MW Gandhar 1320 MW Raigarh Solar PV Lara 1,600MW(120+250MW) Korba 2,600M Gadarwara (1600 MW) Bhilai Mouda (2,320 MW) 574MW (648MW) Rojmal (50 MW) एनटीपीसी NTPC A Maharatna Company Share of Electricity Generated (during FY17) 24% 76% Rest of India 883.07 BUS NTPC (Group) 276.77 BUS Installed Capacity: 51671 MW Kawas Sipat 2,980MW (645MW) Solapur Ramagundam (1,320MW) (2,600MW)+(10MW solar) Ratnagiri (1,967MW) Telangana (3,000MW)+10MW Solar Fuel Mix No. of Plants Capacity (MW) % Share Talcher Thermal (460MW) NTPC Owned Coal 20 38,755 75.00% Kudgi (1600MW) (2,400MW) Simhadri 2,000MW) Anantpur Solar (29JMW) Gas/Liquid Fuel 7 4,017 7.77% Hydro 1 800 1.55% Solar/Wind 12 883 1.71% A&N Solar PV (5MW) Vallur (1,500MW) Sub-total 40 44,455 86.03% Kayamkulam (350MW) Owned by JVs and Subsidiaries Coal 8 5,249 10.16% Gas 1 1,967 3.81% Map not to scale. Includes capacity of under construction plants Thermal Power Stations Ongoing Hydro Power Projects Gas Power Stations Sub-total 9 7,216 13.97% Ongoing Thermal Projects Solar PV Hydro Power Stations Wind Power Project Total 49 51,671 100.00% Copyright © 2016 Your Company All Rights Reserved.
View entire presentation