Investor Presentaiton slide image

Investor Presentaiton

NHPC - Projects in Operation एनएचपीसी NHPC 22 Installed Design Tariff NHPC Project & Year of Capital Cost S. No Capacity Energy State/UT comm. as on 31.03.20 (MW) (MU) (18-19) (Rs. /Kwh)* Type of the project 1 Baira Siul (3x60) 180 779.28 1981 204.86 2.04 Run of River (ROR) with small Himachal Pradesh (Sep) pondage 2 Loktak, (3*35) 105 448.00 1983 195.35 3.85 Storage Manipur (May) 3 Salal, (6x115) 690 3082.00 1987 1050.10 2.35 ROR Jammu & Kashmir (Nov) Tanakpur, (3x40) 94 452.19 1992 421.33 3.29 ROR Uttarakhand (Apr) 5 Chamera-1, (3x180) 540 1664.55 1994 2091.88 2.28 Storage Himachal Pradesh (Apr) 6 Uri-1, (4x120) & Kashmirammu Jammu 480 2587.38 1997 3442.46 2.11 ROR (Apr) 7 Rangit, (3*20) 60 338.61 2000 504.94 3.80 ROR with small pondage Sikkim (Feb) 8 Chamera-II, (3*100) 300 1499.89 2004 2018.64 2.01 101 ROR with sm ROR with small pondage Himachal Pradesh (Feb) Dhauliganga-1, (4x70) 280 1134.69 2005 1769.07 2.43 ROR with small pondage. Uttarakhand (Oct) 10 Dulhasti, (3x130) 390 1906.8 2007 5242.86 5.99 ROR with small pondage Jammu & Kashmir (Mar)
View entire presentation