NHPC - Projects in Operation
एनएचपीसी
NHPC
22
Installed
Design
Tariff
NHPC Project &
Year of
Capital Cost
S. No
Capacity
Energy
State/UT
comm.
as on 31.03.20
(MW)
(MU)
(18-19)
(Rs. /Kwh)*
Type of the project
1
Baira Siul (3x60)
180
779.28
1981
204.86
2.04
Run of River (ROR) with small
Himachal Pradesh
(Sep)
pondage
2
Loktak, (3*35)
105
448.00
1983
195.35
3.85
Storage
Manipur
(May)
3
Salal, (6x115)
690
3082.00
1987
1050.10
2.35
ROR
Jammu & Kashmir
(Nov)
Tanakpur, (3x40)
94
452.19
1992
421.33
3.29
ROR
Uttarakhand
(Apr)
5
Chamera-1, (3x180)
540
1664.55
1994
2091.88
2.28
Storage
Himachal Pradesh
(Apr)
6
Uri-1, (4x120)
& Kashmirammu
Jammu
480
2587.38
1997
3442.46
2.11
ROR
(Apr)
7
Rangit, (3*20)
60
338.61
2000
504.94
3.80
ROR with small pondage
Sikkim
(Feb)
8
Chamera-II, (3*100)
300
1499.89
2004
2018.64
2.01
101 ROR with sm
ROR with small pondage
Himachal Pradesh
(Feb)
Dhauliganga-1, (4x70)
280
1134.69
2005
1769.07
2.43
ROR with small pondage.
Uttarakhand
(Oct)
10
Dulhasti, (3x130)
390
1906.8
2007
5242.86
5.99
ROR with small pondage
Jammu & Kashmir
(Mar)View entire presentation