Investor Presentaiton
•
2023 Alaska Investor Trip
Facilities Design & Logistics Approach
Phasing & standardized truckable design reduce cost and risk
Project costs reduced through:
Standardized truckable NPF ~US$200m savings vs. typical North
Slope sealift design
Route Overview
•
Driven by standardization of design and equipment
.
14' x 130' x 16' x 90-ton modules
.
Facilities built in Canada and then transported via barges and
trucks to Alaska development site
Project execution risk reduced through:
•
Contracting (EPF(1) lump sum)
•
Utilizing proven and standard equipment / designs
.
Truckable modules
Sea
•
Increasing seasonal transport window from 1 month to 10 months
•
Reducing peak activity levels
•
River lift modules increasing fabrication window up to 3 months
•
Leveling workforce needs
Installing modules that are trial fit in fabrication yard
(1) Engineering, Procurement, Fabrication
0
200
400
Miles
UNITED
STATES
Fairbanks
Nome
Anchorage
Seward
-SEALIFT ROUTE
GROUND TRANSPORT ROUTE
MACKENZIE RIVER ROUTE
Yukon
Inuvik
Whitehorse
Juneau
Gulf of
Alaska
Great
Bear Lake
Santos
Northwest
Territories Yellowknife
Great
Slave
Lake
Alberta
Prince Rupert
British
Columbia
Vancouver
Lake
Athaba
Edmonton
Calgary
26View entire presentation