Hunting Large High-Grade Gold Deposits in Côte d'Ivoire
Mako Gold
TCHAGA PROSPECT - UPCOMING MAIDEN RESOURCE
227,000 ml
N
1,012,000 mN
3m @ 4.54g/t Au
23m @2.46g/t Au
17m @ 3.06g/t Au
1,011,500 mN
1.8km
LODE 4
32m @ 7.1g/t Au
5m @ 21.99g/t Au
13m @ 20.82g/t Au
18m @ 3.25g/t Au
LODE 3
28m @ 4.86g/t Au
25m @ 3.43g/t Au
41m @ 4.51g/t Au; and
15m @1.32g/t Au
LODE 2
36m @ 3.09g/t Au; and
MORE
LODES ?
EMERGING
NEW LODES
Drill Hole Legend
(Au gram metres)
о
>50
10 to 50
5 to 10
1 to 5
Pending assays
<1
Gold Mineralised Zones
(projected to surface)
Interpreted from drill intercepts
Gold Soil Anomaly
+40 ppb Au
Interpreted Structure
Main Napie Fault D1
Cross-cutting structure D2
14m @ 5.46g/t Au; and
9m @ 4.08g/t Au; and
8m @ 1.59g/t Au
26m @ 4.34g/t Au; and
7m @ 2.83g/t Au
Shallow mineralisation in drilling
over 1.8km strike-length
Stacked high-grade lodes associated
with D2 cross-faults
✰ Large portions of soil anomaly (yellow)
yet to be drilled
Wide high-grade gold intercepts¹
41m at 4.51g/t Au from 17m
32m at 7.10g/t Au from 13m
26m at 4.34g/t Au from surface
13m at 20.82g/t Au from 32m
36m at 3.09g/t Au from 43m
28m at 4.86g/t Au from 83m
25m at 3.43g/t Au from 53m
18.5m @ 1.15g/t Au
LODE 1
1,010,500 N
100
9m @ 6.26g/t Au; and
4m @ 1.48g/t Au
14m at 5.46g/t Au from surface
7.7m at 11.65g/t Au from 169m
MORE
LODES ?
11m @ 3.28g/t Au
Tchaga Prospect Plan View
Averages 36m at 2g/t Au
1 Refer to ASX announcements dated 22 June 2018, 13 March 2019, 25 July 2019, 3 December 2019, 5 March 2020,
15 July 2020, 11 August 2020, 9 November 2020, 17 November 2020, 14 December 2020, and 13 January 2021
8View entire presentation