Investor Presentaiton slide image

Investor Presentaiton

LUCIE AIRBAG Example of a project which will benefit from 2018's transaction proceeds New high school in Courbevoie (department Hauts-de-Seine) Project amount : € 53.6 M Region share: 100% Expected due date: summer 2018 Projects in category Buildings and equipments for education and leisure Building of a new high school with a capacity of 1 500 students to adress the strong demographic push in Western Paris area; Implementation at the heart of the city of Courbevoie, on a 10 370m² plot benefiting from good public transport services for the future users; Urban implementation of good quality according to the city's orientations (students access protected from road traffic, continuity with the existing buildings), multi purpose room available to external people; Realization of 13 900m² of buildings and landscaped remodeling of all outside areas (keeping the existing trees) completed with a majority of vegetated roofs. The works: progression and deadlines Preparation of field: summer 2016 Start of work site: January 2017 (Eiffage general enterprise in charge of the construction market) Opening to students planned in September 2018, with a work agenda on 18 months particularly ambitious An exemplary high school : ☐ From an environmental standpoint: operation certified «NF Tertiary Building-Approach HQE» (environmental high quality) with energetic requirements but also in greening (vegetated roofs, landscaped knots, recovery rainwater), users comfort, waste management and green work site; From an economic standpoint: diversified training offer facing the job market evolutions (general education completed by a course on Management, by a preparatory class for entrance to the 'Grandes Ecoles', and by an international section); From a social standpoint: integration of a clause on insertion and assistance to employment in the works market Operation targeting the BEPOS label : << Positive Energy Building >> A sober building due to its compactness and its strenghtened insulation; ■ Performing technical systems with ventilations and a high efficiency boiler completed by a cogeneration; Production of photovoltaic electricity equivalent to the thermal regulation needs (heating, ventilation, hot water, lighting). O Direction des finances - Région Ile-de-France 56 îledeFrance
View entire presentation