Strategic Priorities and Growth Outlook
Key Milestone
SARDA
SARDA ENERGY & MINERALS LTD.
Installed 25 TPD Electric Arc
Furnance in 1990
Acquired 3 Power units in
1993-94
Installed Two Sponge Iron
1979-89
Kilns of 30K MT each in 1993
and 1995
1999-08
Company acquired Raipur
Wires and Steel as a sick unit
in 1979
Installed 10 MT electric arc
furnace in 1981 to produce
ingot
Installed Continuous casting
machine in 1984 for Billet
production
Sold two power units and
installed one as captive power
plant
1989-99
Company started 24 MW captive
power plant and Ferro Alloy plant
in 2001
Commenced a fly ash brick plant
to utilize hazardous fly ash from
captive power plant
Acquired Iron ore mine with
reserves of 20 Mn MT.
I, commenced iron ore extraction
from the mines n 2004
Coal mines and 4.8 MW
Hydro power plant started
operations in 2008-09
Pellet plant commenced
operations in 2009-10
66 MVA Ferro Alloys plant
and 80 MW Thermal power
plant started at Vizag in
2012-13
24 MW Hydro Power
project started in July 2017
2008-18
Post 2018
Steel plant capacity to be
increased by 50% in FY
2019
Commissioning of 96
MW Hydro Power plant
located in Sikkim in FY
2020 and 24 MW plant
located in Chhattisgarh in
FY 2022
4View entire presentation