NioCorp SPAC Presentation Deck slide image

NioCorp SPAC Presentation Deck

Classification ● Proven Probable . TOTAL Tonnage (Kt) 36,656 Underground In Situ Mineral Reserves Estimate for Elk Creek Nb₂05 Grade (%) Payable TiO₂ Nb Grade (t) (%) 0.81 NioCorp Critical Mineral Security Contained Nb₂O5 (t) 297,278 Elk Creek S-K 1300 Mineral Reserve¹ (not including REE production) (MINERAL RESERVE AS OF June 30, 2022) 36,656 0.81 297,278 170,409 2.92 170,409 2.92 Contained TiO₂ (t) 1,071,182 Payable TiO₂ (t) Sc Grade (ppm) 431,793 70.2 1.071.182 431,793 70.2 Contained Payable Sc (t) Sc₂O3 (t) The economic assumptions used to define Mineral Reserve cut-off grade are as follows: o Annual life of mine (LOM) production rate of ~7,450 tonnes of FeNb/annum during the years of full production. o Initial elevated five-year production rate ~ 7,500 tonnes of FeNb/annum when full production is reached. O 2,573 NOTES The Qualified Person for the Mineral Reserve estimate is Optimize Group Inc. The estimate has an effective date of June 30, 2022. The Mineral Reserve is based on the mine design, mine plan, and cash-flow model utilizing an average cut-off grade of 0.679% Nb₂O5 with an NSR of US$ 180/t. 2.573 3.677 3,677 The estimate of Mineral Reserves may be materially affected by metal prices, environmental, permitting, legal, title, taxation, socio-political, marketing, infrastructure development, or other relevant issues. Mining dilution of -6% was applied to all stopes and development, based on 3% for the primary stopes, 9% for the secondary stopes, and 5% for ore development. o Mining recoveries of 95% were applied in longhole stopes and 62.5% in sill pillar stopes. ● Parameter Mining Cost Processing Water Management and Infrastructure. Tailings Management Other Infrastructure General and Administrative Royalties/Annual Bond Premium Other Costs Total Cost Nb₂O5 to Niobium conversion Niobium Process Recovery Niobium Price TiO₂ Process Recovery TiO₂ Price Sc Process Recovery Sc to Sc₂O3 conversion Sc Price Value 42.38 106.70 16.62 2.01 5.47 8.91 8.34 6.29 196.72 69.60 82.36 39.60 40.31 0.88 93.14 153.40 3,675.00 Unit US$/t mined US$/t mined US$/t mined US$/t mined US$/t mined US$/t mined. US$/t mined. US$/t mined US$/t mined % % US$/kg % US$/kg % % US$/kg Price assumptions are as follows: FeNb US$ 39.60/kg Nb, Sc₂O3 US $3,675/kg, and TiO₂ US $0.88/kg. Price assumptions are based upon independent market analyses for each product as of June 30, 2022 Price and cost assumptions are based on the pricing of products at the "mine-gate," with no additional down-stream costs required. The assumed products are ferroniobium (metallic alloy shots consisting of 65% Nb and 35% Fe), a titanium dioxide product in powder form, and scandium trioxide in powder form. The Mineral Reserve has an average LOM NSR of US$ 563.06/tonne. Optimize Group has provided detailed estimates of the expected costs based on the knowledge of the style of mining (underground) and potential processing methods (by 3rd party Qualified Persons). Mineral reserve effective date is June 30, 2022. The financial model was run after the estimate of the NSR above, which reflects a total cost per tonne of US$ 196.72 versus US$ 189.91. This is not considered a material change. Price variances for commodities are based on independent market studies versus earlier projected pricing. The independent market studies do not have a negative effect on the reserve. 1 Based on the S-K 1300 Elk Creek Technical Report Summary. See "Mineral Reserves and Resources" in the Disclaimers & Technical Disclosures the beginning of this presentation. 44
View entire presentation